{OCO} Network Manager - EMS
State-of-the-Art Suite of Power Applications
Highly Reliable
Field Tested
NERC Compliant
Multi-User
30%
Operational Savings
99.9%
System Reliability
12K+
Buses (CAISO)
24/7
Real-Time Control
Typical ACE Performance (24 Hours)
Generation Control
AGC, Economic Dispatch, Reserve Monitoring. Regulates frequency and interchange to scheduled values.
- Closed-loop control
- NERC CPS1/CPS2
Scheduling
STLF, Unit Commitment, Transaction Evaluation. Minimize operating cost with 7-day optimization.
- Neural network forecasting
- OASIS integration
Network Security
State Estimation, Contingency Analysis, OPF. Real-time security monitoring and optimization.
- 12,000+ bus capability
- Bad data detection
Dispatcher Training
High-fidelity simulator with identical EMS environment. Train for rare emergency conditions.
- Blackstart scenarios
- Relay models
AGC Closed-Loop Control
RTU/ICCP Data
ACE Calculation
Control Algorithm
Generators
2-6 second cycle time | Multiple ACE calculation methods | Unit limit enforcement