Global Installations

California ISO
12,000 buses
CFE Mexico
1,200 buses
DEWA Dubai
1,000 buses
PPoA Alberta
1,000 buses
CAMMESA
1,200 buses
PEPCO
2,500 buses
NYSEG
2,500 buses
50+
Utilities Worldwide
12,000
Largest Bus Count
24/7
Continuous Operation
99.99%
Availability

California ISO (CAISO)

Largest EMS installation in North America

System Specifications

  • Buses: 12,000+
  • Generators: 1,500+
  • Transmission Lines: 3,000+
  • State Estimation: 2-minute cycle
  • Contingency Analysis: 1,000+ events

Key Benefits

  • 30% reduction in operator workload
  • Improved renewable integration (35% renewables)
  • Real-time congestion management
  • Market efficiency improvements
"The {OCO} Network Manager has been instrumental in managing one of the most complex grids in the world with high renewable penetration."

CFE Mexico

1,200 buses - National control center

  • Integrated AGC with hydro-thermal coordination
  • Real-time security monitoring
  • Interchange scheduling with US utilities
1,200 buses
Hydro Optimization

DEWA Dubai

1,000 buses - Dubai Electricity & Water Authority

  • Integrated water-power coordination
  • High reliability requirements (99.99%)
  • Advanced DTS for operator training
Desalination Integration

Power Pool of Alberta

1,000 buses - Alberta, Canada

  • Market-based dispatch
  • High voltage stability requirements
  • Intertic with BC and Saskatchewan
Market Integration

CAMMESA Argentina

1,200 buses - Wholesale electricity market

  • Nationwide coordination
  • Hydro-thermal optimization
  • Emergency response systems
1,200 buses

PEPCO (Potomac Electric Power)

System Size

  • 2,500 buses
  • Washington DC metropolitan area
  • High reliability requirements

Key Applications

  • Security Monitor with 2,800 circuits
  • 2,300 bus bars monitored
  • Real-time contingency analysis

New York State Electric & Gas (NYSEG)

System Size

  • 2,500 buses
  • Upstate New York
  • Mix of urban and rural loads

Key Applications

  • Security Monitor (pioneer implementation)
  • 2,800 circuits monitored
  • 2,300 bus bars

Performance Summary

State Estimation Performance

AGC Performance (CPS1/CPS2)

Average State Estimation

99.7%
Measurement Availability

Contingency Analysis

500+
Events every 5 minutes

System Availability

99.99%
Average across sites