Field Experience & Case Studies
Proven track record with leading utilities worldwide
Global Installations
California ISO
12,000 buses
CFE Mexico
1,200 buses
DEWA Dubai
1,000 buses
PPoA Alberta
1,000 buses
CAMMESA
1,200 buses
PEPCO
2,500 buses
NYSEG
2,500 buses
50+
Utilities Worldwide
12,000
Largest Bus Count
24/7
Continuous Operation
99.99%
Availability
California ISO (CAISO)
Largest EMS installation in North America
System Specifications
- Buses: 12,000+
- Generators: 1,500+
- Transmission Lines: 3,000+
- State Estimation: 2-minute cycle
- Contingency Analysis: 1,000+ events
Key Benefits
- 30% reduction in operator workload
- Improved renewable integration (35% renewables)
- Real-time congestion management
- Market efficiency improvements
"The {OCO} Network Manager has been instrumental in managing one of the most complex grids in the world with high renewable penetration."
CFE Mexico
1,200 buses - National control center
- Integrated AGC with hydro-thermal coordination
- Real-time security monitoring
- Interchange scheduling with US utilities
1,200 buses
Hydro Optimization
DEWA Dubai
1,000 buses - Dubai Electricity & Water Authority
- Integrated water-power coordination
- High reliability requirements (99.99%)
- Advanced DTS for operator training
Desalination Integration
Power Pool of Alberta
1,000 buses - Alberta, Canada
- Market-based dispatch
- High voltage stability requirements
- Intertic with BC and Saskatchewan
Market Integration
CAMMESA Argentina
1,200 buses - Wholesale electricity market
- Nationwide coordination
- Hydro-thermal optimization
- Emergency response systems
1,200 buses
PEPCO (Potomac Electric Power)
System Size
- 2,500 buses
- Washington DC metropolitan area
- High reliability requirements
Key Applications
- Security Monitor with 2,800 circuits
- 2,300 bus bars monitored
- Real-time contingency analysis
New York State Electric & Gas (NYSEG)
System Size
- 2,500 buses
- Upstate New York
- Mix of urban and rural loads
Key Applications
- Security Monitor (pioneer implementation)
- 2,800 circuits monitored
- 2,300 bus bars
Performance Summary
State Estimation Performance
AGC Performance (CPS1/CPS2)
Average State Estimation
99.7%
Measurement Availability
Contingency Analysis
500+
Events every 5 minutes
System Availability
99.99%
Average across sites